βExhaustedβ is no longer a strong enough word to describe our mental and physical being.
Iβm not sure I can form full sentences at this point, so this weekβs update is in the form of a list and pictures.
- The toilet has returned (thanks Connor) π
-
I learned how to grout tiles ππ½
-
The bathroom floor is completeπ
-
The shower tiles are on the wallπ
-
The sockets WORK (weβve worked from a single power supply for 100+ days) π₯
-
I built 2 more units π¨
-
Mum built a pipe box π§
-
Dad secured the hallway floorπ©
-
Iβve been to B&Q more times than I care to count.
I also managed to slice both my thumbs on my shower fitting, but donβt worry, the cement from tiling soon sealed them back up again.
Entering October and Iβve got everything crossed that maybe (just maybe) this month I can start living here!